|  |
|
Dominion Terminal
Associates offers a multitude of blending options
which can produce blending to meet customers' needs. The following pages
provide the details of Pile/Direct Dump Blending,
Two-Pile Blending, and
Three-Pile
Blending.
 |
Pile Layering (Stacking) –
In addition to the above methods of blending, layering can be done in stacking to achieve a
degree of blending in the piles. Inbound trains can be scheduled with the CSX Railroad to
arrive at certain times so as to stack or layer coals into a pile in a planned sequence.
DTA can also line up the cars in the load tracks for dumping in any sequence desired by
the customer to accomplish layering in the piles. The piles stacked in this fashion can be
reclaimed in a stair step manner to obtain a good cross section of the pile to insure
uniform quality throughout the vessel loading.
|
 |
Silo Layering (Reclaiming) –
DTA can establish a sequence of
reclaiming set amounts of coal from one pile then switching to another pile, layering
the coals in the outbound silos and alternate reclaiming from two or more piles. As many as
eight piles have been involved in a reclaiming rotation.
|
|
|
|
|
|